Check the boundaries and access to the plot
First check precisely where the plot boundaries lie, so that no dispute arises with neighbours or the municipality about property boundaries, fences or temporary construction routes. If necessary, consult the Land Registry (Kadaster) or have the boundaries staked out by a surveyor.
Also look carefully at access to the plot: can trucks, excavators and suppliers reach the site safely? A driveway that is too narrow, a soft verge or a limited turning circle can cause a lot of delay during construction. Also think of temporary road plates or a reinforced access road if the site is difficult to traverse.
With a care unit, the distance to the property boundary is especially important: within 2 metres of the property boundary, windows with a view of the neighbours' yard are not simply allowed. So determine the spot before the foundation is laid. With the free permit check you can see what is allowed at your address.
Clear the building land of waste and vegetation
Before building can take place, the building land must be clean and clear. Remove old rubble, waste, loose materials, shrubs, roots and any trees that are in the way. Note that felling trees sometimes requires a permit; your municipality arranges that.
Old foundations, fences or underground remains can also cause problems if they are not removed in time. A tidy plot makes it easier for contractors to work and reduces the chance of damage, accidents or unexpected costs during the groundwork.
Make a KLIC notification before digging
Under many gardens lie cables and pipes for gas, electricity, water and internet. Anyone who digs mechanically, for example for pad foundations, screw piles or the trenches for the connections, is legally required to report this in advance to the Land Registry (Kadaster, KLIC notification). That obligation also applies to you as the client. You then receive maps of the cables and pipes in the ground, so that the digger knows where to be careful. Plan the notification in good time: it must be in a few working days before the start.
Arrange temporary water and electricity supplies
During construction, water and electricity are often needed before the permanent connections are ready. So arrange temporary facilities in good time, such as a construction connection for electricity and a temporary water connection. These are needed for tools, lighting, machines, cleaning work and sometimes also for the site cabin.
Allow for the application periods at grid operators and water companies, as these can be longer than expected. Discuss with the contractor how much power capacity is needed, so that the temporary connection is strong enough for the work on site.
Permanent connections for a unit
If you place a prefab unit, you have the pipes for electricity, water and sewer laid in advance up to the unit's spot. Inside, the unit has all connections correctly prepared. Connecting to electricity, water and sewer on site is done by a local specialist. The closer the unit stands to existing connection points, the less digging is needed.

Investigate the soil and plan drainage well
A soil survey gives insight into the load-bearing capacity of the ground and any contamination. This is important for the foundation, but also for the safety and planning of the project. On some plots additional investigation is needed, for example on former industrial land or where the ground has been raised.
Also think carefully about drainage: rainwater must not remain standing on the building site or flow towards the neighbours. By planning drainage, ditches or temporary discharge in advance, you prevent mud, subsidence and delays caused by water nuisance.
Foundation for a unit
A prefab unit usually stands on concrete pad foundations, screw piles or a concrete slab. The foundation must be level and the correct size before installation day. You can read which foundation suits your ground in which foundation does a living unit need?
Provide safe storage and room for machines
A building site needs sufficient space for machines, materials, containers and possibly a site cabin. Determine in advance where everything can stand safely without blocking access or hindering the work. Materials such as wood, insulation and cement must be stored dry and stable, while valuable tools must be well secured against theft.
Also provide clear walkways and sufficient manoeuvring space for machines. A clearly organised plot increases safety and ensures the construction runs more efficiently.

Preparing for the crane and installation day
A care unit is delivered by truck and placed on the foundation with a crane, sometimes over the house. So provide:
- A set-up spot for the crane that is firm and level enough; on soft ground, road plates are needed.
- Clear lifting space: no overhead lines, overhanging branches or obstacles in the swing radius.
- Permission for the public road: if the crane or truck stands on the street, the municipality often requires a permit or exemption. We or the haulier arrange that; you do not have to apply for it yourself.
- Informed neighbours: let them know when the street will be temporarily occupied.
The installation itself is usually done within a day (for a single unit). If you couple multiple units, installation takes longer. Also read how is an informal-care home installed? and how long does installation take?
Plot preparation checklist
- Property boundaries checked and the spot of the unit determined.
- Permit or permit-free situation confirmed (our permit advice is free; having the application handled costs € 995.00 incl. VAT (€ 822 excl. VAT)).
- Trees, shrubs, rubble and old remains removed; felling permit arranged where necessary.
- KLIC notification made before digging.
- Soil assessed and foundation laid level.
- Pipes for electricity, water and sewer laid up to the spot.
- Drainage arranged.
- Access route and crane set-up spot clear and load-bearing.
- Exemption for the public road arranged (by us or the haulier) and neighbours informed.
You tick transport, foundation and installation in the quote request; you receive an indication by email. Then choose your care unit.
Conclusion
A well-prepared plot makes the difference between a building project that runs smoothly and a project full of unexpected obstacles. By arranging boundaries, access, groundwork, utilities, soil, drainage and storage well in advance, you give contractors the right conditions to work efficiently and safely. That way the construction does not start with solving problems, but with making progress.