Table of contents
- What exactly does the VCRO regulate around office units?
- VCRO, the Exemption Decree and the environmental permit: how do they fit together?
- When does an office unit require a permit?
- Exemptions for temporary office units
- Zoning and function under the Flemish Codex
- Office units in a residential area or business zone
- Enforcement for unpermitted office fit-outs
- Step-by-step plan: placing an office unit in Flanders
- Conclusion
What exactly does the VCRO regulate around office units?
The VCRO mainly sets the framework within which spatial developments in Flanders may take place. For office units this means that the word “office unit” is not what matters most, but rather whether the fit-out is consistent with the zoning of the plot and whether the works or the use require a permit.
The codex refers, among other things, to planning regulations, spatial implementation plans, subdivision regulations and the general rules on changes of function. An office unit can therefore perfectly well be possible, but only if the location, the fit-out and the use are compatible with the spatial rules in force.
VCRO, the Exemption Decree and the environmental permit: how do they fit together?
The VCRO lays the foundation: planning-related works require an environmental permit, unless the Flemish Government exempts them. Which works are exempt is set out in the Exemption Decree (Vrijstellingsbesluit). You apply for the permit itself through the Flemish government's Environment Portal (Omgevingsloket).
In addition, your municipality may have its own regulations, for example in a spatial implementation plan, a BPA, a subdivision permit or a planning by-law. These can limit an exemption or impose additional conditions. The rules are amended regularly; for example, there have been changes to Flemish environmental law since 1 March 2026. So always check the current rules for your plot.

When does an office unit require a permit?
An office unit may require a permit when planning-related works are carried out, such as building, renovating, extending or structurally changing a building. Dividing an existing space into several separate units can also require a permit, especially if this involves changes to stability, fire safety, access, parking or the layout of the building.
A permit may also be needed for a change of function, for example when a house, warehouse or retail space is mainly used as an office. Whether a permit is actually needed depends on the specific situation and on any exemptions or notification obligations.
Placing a stand-alone office unit
If you place a free-standing prefab office unit on your land, this is in principle regarded as placing a structure. An environmental permit is usually needed for this, unless an exemption applies (see below). For certain movable, modular structures the involvement of an architect is not mandatory, but that does not automatically mean you need no permit or notification.
Exemptions for temporary office units
The Exemption Decree contains a few exemptions that matter for office units. According to the Flemish government, these include:
- Site cabin for permitted works: temporary works for permitted, notified or exempt works, such as a site cabin or office unit on the building site, are exempt. They must be gone again within thirty days after the works end.
- Temporary structures: a maximum of four periods of thirty days per calendar year, not in spatially vulnerable areas and not in conflict with the general zoning of the area.
- Temporary change of function: using a building temporarily for a different main function is also allowed for a maximum of four periods of thirty consecutive days per calendar year.
General conditions apply to all exemptions, such as distance from watercourses and no conflict with local plans. Your municipality may also impose additional conditions. If an office unit stays longer, an environmental permit is generally needed. Also read do you need a permit for an office unit in Belgium?
Zoning and function under the Flemish Codex
The VCRO places strong emphasis on the distinction between the zoning of an area and the function of a building. The zoning indicates what is spatially permitted in a particular place, for example housing, business, agriculture, recreation or community facilities. The function concerns the actual use of a building or space.
An office function must therefore fit within the zoning and the applicable regulations. If a building is in a zone where offices are not permitted or only to a limited extent, fitting out office units can be problematic, even if hardly any renovation work takes place inside.
According to the Flemish government, a change of function in principle always requires a permit. An exemption applies, under conditions, only for complementary functions. Converting a house entirely into an office requires a permit; a limited office as a secondary function in the home can be exempt under conditions.
Office units in a residential area or business zone
In a residential area, office units can sometimes be possible, but usually only if they remain compatible with the residential function and do not cause excessive nuisance. Think of mobility, parking pressure, visitor flows, noise and scale. A small home office is generally assessed differently from a building that is entirely converted into several separate office units. See also office unit at home.
In a business zone, office functions are often easier to defend, but restrictions apply there too: some zones are intended for production, storage or craft activities and permit stand-alone offices only to a limited extent. Local plans and regulations are therefore decisive. An office unit that belongs to an existing business, for example next to a hall, is often easier to justify than a stand-alone office. Read more at office unit at a business hall.

Enforcement for unpermitted office fit-outs
If office units are fitted out without the necessary permit or in conflict with the zoning, the authorities can take enforcement action. This can lead to an official report, a stop order, administrative measures, restoration claims or obligations to regularise or reverse the situation.
A regularisation permit is not automatically guaranteed: the application is assessed as if the works or change of function had not yet taken place. Anyone who wants to create office units is therefore well advised to check in advance which planning rules apply and, if necessary, to seek advice from the municipality or a spatial planning expert.
Step-by-step plan: placing an office unit in Flanders
- Look up the zoning and regulations for your plot (sector plan, RUP, BPA, subdivision).
- Determine whether it concerns temporary use (exemption possible) or a permanent office unit.
- Check whether there is a change of function, for example from house or storage to office.
- If in doubt, ask your municipality's environment department for advice in advance.
- If necessary, submit the application via the Environment Portal and wait for the decision before placing the unit.
- Choose the size of the unit and plan the foundation, transport and connections.
Our office units come in sizes from 5 to 13 metres, from € 15,950 incl. VAT (€ 13,182 excl. VAT). Voordeelunits also delivers and installs in Belgium. You also receive permit advice for a Belgian location, and we handle the permit application in Belgium for a fee (price on request). A compact office unit of 5.2 × 3.2 metres costs € 15,950 incl. VAT (€ 13,182 excl. VAT); for more workstations there is, for example, the office unit of 10.2 × 3.2 metres for € 24,950 incl. VAT (€ 20,620 excl. VAT). Transport, foundation and installation depend on your location; you tick them in the quote request and receive an indication by email. The unit has all connections correctly prepared inside. Connecting to electricity, water and sewer on site is done by a local specialist that you hire.
Conclusion
So the VCRO does not literally say “these are the rules for office units”, but it does determine the legal framework within which office units can be fitted out and used. The key questions are always: does the office function fit within the zoning, are there works or changes of function that require a permit, and does the project comply with local regulations? A check in advance prevents disputes, enforcement and expensive regularisation problems afterwards.
Curious to know more? Watch our videos or make an appointment at our showroom at Hazepad 20 in Breda.