Why an office unit during renovations?
An office unit offers extra or replacement office space immediately when existing workplaces are temporarily unusable. Think of situations in which departments have to make way for demolition work, renovation, installation work or the rearrangement of a building.
Instead of letting employees work scattered at home or at external locations, an office unit creates a central and recognisable workplace on or near the site. That makes communication easier, keeps employees involved in the project and prevents the renovation from completely disrupting the day-to-day organisation.
Continuity for teams and daily processes
During a renovation, continuity is often just as important as the construction schedule itself. Administration, project management, customer service, HR or management must stay reachable and be able to do their work without constantly being interrupted by construction activities.
A temporary office unit helps keep processes clear, because teams stay together and have access to the facilities they need. With good agreements on internet, power, meeting room and storage, the unit can function as a full temporary office.
Moving in phases
In a large renovation the whole building rarely closes at once. Often one department moves into the unit first, and the next follows afterwards. Make a rotation plan that states per phase who sits where. That way you know how many units you need and avoid having too few workplaces at a peak moment.
A safe workplace next to the building site
Safety is an important argument for temporarily placing employees outside the construction area. On an active building site there are risks from dust, noise, heavy equipment, open floors or installation work. By clearly separating an office unit from the construction zone, a calm and safe environment is created where employees can work with concentration.
It is wise to coordinate walking routes, parking spaces and access points properly with the contractor, so that office staff and construction personnel do not needlessly get in each other's way. Include the unit's location in the renovation's health and safety plan (V&G plan).

Practical fit-out of temporary office units
An office unit can easily be furnished based on the work that takes place there. For some organisations a compact unit with desks, chairs and basic facilities is enough, while other companies need several rooms, a meeting table, climate control, sanitary facilities or a pantry.
Matters such as lighting, acoustics, heating, ventilation and data connections also deserve attention. By determining in advance who uses the unit and which functions are necessary, you prevent the temporary workplace from turning out too small, impractical or insufficiently comfortable.
An office unit from Voordeelunits is delivered empty as an open workspace; toilet and kitchen are optional. Walls and floor have Rc 4.55 and the roof Rc 5.56, so even in a renovation that lasts months the unit stays comfortable. You can read more about climate in heating and cooling of an office unit.

Which office units are suitable?
- Customer service or reception: a compact unit of 5 or 6 metres.
- Department with fixed workplaces: 10 to 12 metres, such as the 12×3 Office Unit Almere (€ 28,950 incl. VAT (€ 23,926 excl. VAT)).
- Several departments: several units side by side or the double-width 13.2 × 6.4 Office Unit Connect (€ 68,950 incl. VAT).
Our office units come in lengths from 5.2 to 13.2 metres and are 3.2 metres wide, from € 15,950 incl. VAT (€ 13,182 excl. VAT). You can see all sizes under price per size.
Aligning costs, planning and completion smartly
Deploying an office unit requires good coordination between costs, period of use and construction schedule. The sooner it is clear when departments have to move and how long the renovation lasts, the better you can organise the temporary accommodation. Allow for transport, installation, connections, permits and any adaptations to the site.
By including the office unit in the overall renovation planning, you prevent delays and unexpected costs. That way the organisation stays operational while the renovation is carried out step by step.
- Delivery time: 8 weeks on average. Order in good time.
- Additional costs: transport, foundation and installation depend on your location. You tick them in the quote request and receive an indication by email.
- Connecting: all connections inside the unit are correctly ready. Connecting to electricity, water and sewer on site is done by a local specialist.
- Permit: our permit advice is free; with the permit check you can quickly see what is possible.
According to the national building rules, a temporary structure may stand at the same location for at most 15 years. If you buy the unit, you can keep using it after the renovation, move it or sell it. Also read office unit as temporary accommodation during renovations.
Conclusion
An office unit during major renovations is more than an emergency solution. It is a smart way to create calm, safety and continuity in a period in which a lot changes. With a well-thought-out fit-out and good planning, employees can keep working comfortably, while the building is made ready for the future.