Table of contents
What you see in the timelapse
In this timelapse you see how a unit is installed efficiently and expertly on site. The process starts with preparing the ground, after which the unit is brought in and carefully set in place with the help of a crane. The unit is then precisely adjusted and finished, so that it is immediately ready for use. The whole process runs quickly and in a structured way, which is clearly visible in the sped-up footage.
Installation timelapse – unit placed in the Venlo region
Timelapse of a unit being installed in the Venlo region.
Installation starts with good preparation
Installing a unit always starts with good preparation, such as making the site ready for building and checking the accessibility for transport and installation. The unit is then delivered and positioned on site. Thanks to a streamlined process, a unit can be installed quickly and efficiently, without unnecessary delay.
What you arrange before installation day:
- Ground and foundation: flat, level and load-bearing. Read more in which foundation does a living unit need.
- Route and set-up area: the lorry and the crane need space and a firm surface. A crane is heavy; on soft ground or vulnerable paving, ground mats are sometimes needed.
- Obstacles: check trees, overhead cables, lamp posts and the height of the route.
- Cables and pipes: know where cables, pipes and manholes lie in the ground, so that the crane does not end up standing on them.
- Permission: if the crane stands on the public road, an exemption or traffic measure from the municipality may be needed; we or the haulier arrange that.
You will find a handy checklist in what you prepare on the plot.

Installation day step by step
- Arrival: the unit arrives by lorry or low-loader; the crane is set up.
- Lifting: the unit is slung and gently set on the foundation.
- Levelling: the unit is levelled and secured.
- Finishing: the final details are finished, so that the unit is ready for use.
With good preparation, a unit is often in place within a few hours. You can read how the transport itself works in how is a living unit transported.
The unit has all connections correctly prepared inside. Connecting to electricity, water and sewer on site is done by a local specialist. So schedule that specialist for shortly after installation day.
Speed, quality and convenience
At Voordeelunits, speed, quality and convenience are central. Whether it is about having a unit installed, creating a temporary space or a complete modular solution: the process is fully geared to taking the work off the customer's hands. Thanks to a clear way of working and experienced professionals, every unit is installed professionally and delivered ready for use.
The units are built in a factory hall of more than 5,000 m², according to the Dutch building standard and ISO 9001. The delivery time is 8 weeks on average. By now we have installed 517 units.
Why a prefab unit is in place so quickly
Most of the work is not done on site, but in the factory. Walls, floor, roof, kitchen, bathroom and installations are built there under controlled conditions. Weather and wind therefore have no effect on the construction time, and on your site the work is limited to the preparation, installation day and connecting. That reduces disturbance for you and your neighbours, and you know in advance where you stand.
Installing a unit in the Venlo region or elsewhere
Are you looking for a specialist in installing units in the Venlo region or elsewhere in the Netherlands? Voordeelunits helps you from request to installation with an efficient and reliable process. View the ready-made living unit, put your unit together in the 3D configurator or see more footage in our videos. A living unit costs € 31,950 incl. VAT (€ 26,405 excl. VAT); you tick transport, foundation and installation in the quote request, after which you receive an indication by email.
Conclusion
The timelapse from the Venlo region shows that installing a unit is quick if the preparation is right: a good ground, an accessible route and a free set-up area for the crane. After that, the unit is in place within a short time and a local specialist can connect it.