Table of contents
- Before ordering: choice, quote and permit
- Production and delivery time
- Step 1: the transport arrives early
- Step 2: the unit is attached to be lifted
- Step 3: the unit is lifted onto the transport
- Step 4: the unit is transported to the location
- Step 5: the unit arrives at the final destination
- Step 6: the unit is lifted into place
- Step 7: final check before installation
- Step 8: the unit is placed
- Step 9: final check before the unit is ready for use
- Conclusion
Before ordering: choice, quote and permit
Before a unit hits the road, you go through a few steps. Our step-by-step plan looks like this:
- Decide which unit you need. A living unit, care unit or office unit, and in which size. With the 3D configurator you put the unit together yourself.
- Determine budget and financing. On price per size you can see what a unit costs per size, from € 15,950 incl. VAT (€ 13,182 excl. VAT).
- Check location and permit. With the free permit check you can quickly see what is allowed at your address. Permit advice is free; having the application handled is possible for € 995.00 incl. VAT (€ 822 excl. VAT).
- Choose your unit and request a quote. Transport, foundation and installation depend on your location: you tick these in the quote request, and you receive an indication by email.
- Receive and approve the quote.
- Prepare the permit and the building site.
- Production, delivery, installation and aftercare.
Would you like to see a unit in person first? That is possible by appointment in our showroom at Hazepad 20 in Breda.
Production and delivery time
After your approval, the unit goes into production in a factory hall of more than 5,000 m². The units are built to the Dutch building standard and under ISO 9001. The delivery time is on average 8 weeks. During that period you make sure the permit (if needed) is in place and the site is ready.
Preparing the building site
- Foundation: the unit goes on a flat, stable subsoil, such as concrete blocks, concrete slabs or a concrete foundation. See which foundation does a living unit need?
- Connection points: the unit has all connections correctly prepared inside. Connecting to electricity, water and sewer on site is done by a local specialist. Make sure the pipes run up to the spot.
- Accessibility: there must be room for the lorry and the crane. Think of the width of the access road, trees, fences, overhead lines and a firm subsoil for the crane.
You can find a full checklist in what do you need to prepare on the plot?

Step 1: the transport arrives early
The day of delivery starts early in the morning: the transport arrives early at our location. The lorry arrives on time, so that the unit can be loaded calmly and carefully. By starting the day early, we make sure everything is well prepared and the loading process runs efficiently and without haste. This contributes to safe handling and a smooth continuation of the transport to the final destination.
Step 2: the unit is attached to be lifted
The second step is attaching the unit for lifting. First the unit is thoroughly inspected to see whether it is in good condition. The unit is then carefully attached to the crane, after which it is lifted in a controlled manner.
Step 3: the unit is lifted onto the transport
Before the unit actually departs, it is carefully placed on the transport. Several checks are carried out to verify that the unit is firmly in place and correctly secured. Through these precise checkpoints we make sure the unit can safely take to the road and the transport can take place without risks.

Step 4: the unit is transported to the location
The unit then sets off for its destination. With a large lorry the unit is transported safely and stably, so that it arrives at the right location without problems. During transport the dimensions and weight of the unit are taken into account, so that the journey runs smoothly and under control. A unit that is 3.2 metres wide is wider than a normal lorry; the route is therefore checked in advance. You can read more about this in how is a living unit transported?
Step 5: the unit arrives at the final destination
After the journey, the unit arrives at the final destination. The lorry drives extremely slowly and with great care, so that the site can be entered neatly and safely. Thanks to this careful approach, damage to the surroundings is avoided and the unit can be delivered exactly at the right spot.
At the location the foundation has been laid and the connections are ready, so that after installation a specialist can connect the electricity and water supply to the technical room in the unit.
Step 6: the unit is lifted into place
On arrival, the unit is lifted off the lorry with a crane. This is done in a controlled manner, step by step, so that the unit can be taken off the transport safely. By using the crane, the unit can be moved precisely and prepared for installation on site. In strong wind no lifting takes place; the planning takes this into account.

Step 7: final check before installation
In one of the last steps, the unit is checked before it is finally placed. While the unit hangs just above the ground, a manual check takes place to verify that everything is correctly aligned. That way small adjustments can still be made easily and a perfect installation is guaranteed.
Step 8: the unit is placed
Finally, the unit is carefully placed at the desired spot. With the crane, the unit is gently lowered until it stands exactly in the right position. Thanks to this precise placement, the unit fits perfectly into its surroundings and is almost immediately ready for use. You can see how quickly that goes in our timelapse of a unit being installed.
Step 9: final check before the unit is ready for use
After installation, a follow-up check is carried out to be sure everything has been finished correctly and safely. It is checked whether the unit stands stable and meets all expectations. Once this final check is complete and the local specialist has connected the unit to electricity, water and sewer, the unit can be put into use.
After handover
- Notify your insurer of the unit.
- If the municipality asks for it, submit the notification of completion of the construction.
- Keep the unit in good condition with simple maintenance; with good maintenance a unit lasts 20 to 30 years.
- Do you have a question or a report after handover? Then use our service page.
Conclusion
Ordering a unit takes place in clear steps: choosing, quote, permit and preparation, production in on average 8 weeks and then one delivery day with transport, lifting, placing and checking. Those who prepare the building site and the connection points well will have the unit in use quickly. How this works out in practice can be read in from request to handover in 12 weeks.
Ready for the next step? Request a quote or watch the full videos.