Permits for living units in the Netherlands: complete guide

Living units are increasingly popular in the Netherlands as a temporary home, informal-care solution, student accommodation, emergency housing or extra space on your own land. Even so, you cannot simply place a living unit anywhere. In many cases you have to deal with permits, municipal rules, the zoning plan (omgevingsplan) and technical requirements. In this complete guide you can read when a permit is needed, which rules apply and how to prepare an application well.

Maarten from Voordeelunits approx. 6 minutes read
Two living units in a garden, placed with the correct permit
Frequently asked questions

Frequently asked questions about this topic

Can't find your question? Call, email or WhatsApp us.

Do I need a permit for a living unit in my garden?

Usually yes if you want to live in it. Whether it can be permit-free depends on the building rules and the zoning plan. Also read may you place a living unit in the back garden.

What is the difference between the omgevingsplan and the bestemmingsplan?

Since the Environment and Planning Act, the omgevingsplan (zoning plan) is the successor to the bestemmingsplan (old zoning plan) and contains all local rules for the physical living environment.

Is a temporary living unit permit-free?

Not automatically. Municipalities are often more flexible with temporary occupancy, but a temporary permit is usually needed.

May an informal-care home be permit-free?

In many cases yes, under conditions such as a demonstrable care relationship, a maximum height of 5 metres and, outside the built-up area, relocatable and a maximum of 100 m². At a monument or protected view a permit is needed.

Where do I apply for a permit?

Via the Environment Portal (Omgevingsloket). There you can also first check whether a permit is needed.

Which documents do I need?

Often a site plan, floor plan, facade elevations, technical specifications, structural data, photos of the location and an explanation of the use.

How long does a permit application take?

In the regular procedure 8 weeks, with one possible extension of 6 weeks. The extended procedure takes longer.

What does a permit for a living unit cost?

The fees differ per municipality: sometimes a fixed amount, sometimes a percentage of the construction cost. If you want us to handle the application, it costs € 795.00 incl. VAT (€ 657 excl. VAT).

What can I do if my application is refused?

Adjust the design, supply extra information or lodge an objection, usually within six weeks after the decision.

What is a request in principle (principeverzoek)?

A request to the municipality to indicate in advance whether it is broadly willing to cooperate with your plan, before you submit a full application.

What happens if I place a unit without a permit?

The municipality can enforce, for example with a penalty order or an obligation to remove the unit.

Does Voordeelunits help with the permit?

Yes. Permit advice is free, as is the permit check, and having the application handled costs € 795.00 incl. VAT (€ 657 excl. VAT).

Quote in 5 steps

Request a no-obligation quote

Tell us what you want to use the unit for. You will receive a tailor-made quote.

  1. 1Purpose
  2. 2Type of unit
  3. 3Size
  4. 4Wishes
  5. 5Details
What do you want to use the unit for?
Make an appointment

Schedule an appointment

The appointment is in our showroom: Hazepad 20, 4825 AV Breda.

Do you already have a location for the unit?
Hazepad 20, 4825 AV Breda Plan your route
SIP panel home

Price indication per m²

A SIP panel home is a complete house, built modularly built from SIP panels. Choose the floor area and see the price of the home instantly.

SIP panel home price € 117,000 excl. VAT € 141,570 incl. VAT From € 2,359.50 per m² incl. VAT (€ 1,950 per m² excl. VAT), 2 or 3 bedrooms. Transport, foundation and installation come on top.