Table of contents
- When is a permit needed for living units?
- Two tests: building and use
- Rules per municipality and the zoning plan
- Placing a temporary living unit: what is allowed?
- Informal-care home: wider possibilities
- Submitting an application: documents and steps
- Costs, deadlines and objection in case of refusal
- What if you place a unit without a permit?
- Conclusion
When is a permit needed for living units?
A permit for a living unit is usually needed when the unit is intended to live in, when it stays for a longer time or when the placement affects the surroundings. Think of a living unit in the garden for family, a temporary home during a renovation, an extra accommodation on a business site or several units for labour migrants or students.
Under the Environment and Planning Act (Omgevingswet), the municipality looks at, among other things, the use of the land, the structural characteristics, fire safety, connection to utilities and the consequences for neighbours and surroundings. Sometimes a small unit can seem permit-free, but as soon as there is independent occupancy, permanent placement or deviation from the zoning plan, permission is often required after all.
Two tests: building and use
Under the Environment and Planning Act, a 'building permit' consists of two parts that you need to look at separately:
- The building activity (technical): does the unit comply with the national building rules in the Buildings Decree for the living environment (Besluit bouwwerken leefomgeving, Bbl), such as fire safety, ventilation and construction? Some structures are permit-free in technical building terms.
- The zoning plan activity (spatial): do the unit and its use fit within the municipality's zoning plan (omgevingsplan)? If not, a permit is needed to deviate, the so-called out-of-plan zoning activity (buitenplanse omgevingsplanactiviteit).
A unit is therefore only truly permit-free if it meets both tests. Case law shows that an outbuilding in the back garden is not automatically permit-free if it does not fit within the rules of the zoning plan. Even without a permit, the unit must comply with the technical building rules. Our units are built to the Dutch building standard, with insulation of Rc 4.55 in walls and floor and Rc 5.56 in the roof.
Rules per municipality and the zoning plan
The rules for living units differ per municipality, because each municipality pursues its own policy within the zoning plan (omgevingsplan), the successor to the old zoning plan (bestemmingsplan). That plan states what may happen at a location: living, working, recreation, agricultural use or a combination of these. If the land is, for example, designated only for garden or agricultural use, a living unit may not automatically be placed there.
Rules may also apply for maximum height, surface area, distance to the property boundary, appearance, parking and the number of residents. It is therefore wise to contact the municipality before buying or placing a living unit, or to consult the Environment Portal (Omgevingsloket), so that you know whether the plan fits within the local rules. You get a first impression with our free permit check, and on the municipalities page you will find local information.

Placing a temporary living unit: what is allowed?
Placing a temporary living unit is sometimes simpler than building a permanent home, but temporary placement is not automatically permit-free either. For temporary occupancy during a renovation, informal care or an emergency, the municipality may handle the application more flexibly, especially if it is clear how long the unit will stay and when it will be removed again. Many municipalities have their own policy rules for this, with for example a maximum term.
Temporary living units must also be safe, healthy and usable, with sufficient ventilation, sanitary facilities, fire safety and sometimes connections to water, electricity and sewer. The unit has all connections correctly prepared on the inside. Connecting to electricity, water and sewer on site is done by a local specialist. You can read more in living unit as a temporary home during a renovation.
Informal-care home: wider possibilities
For informal-care homes (mantelzorgwoningen) there are wider possibilities in certain situations, but conditions must still be met, such as the existence of a demonstrable care relationship and use as dependent living space. According to the national rules, among other things:
- in technical building terms, a detached informal-care home is in most cases permit-free up to 5 metres in height, if nobody lives on an upper floor and no new main building is created;
- outside the built-up area the unit must be relocatable and may be a maximum of 100 m²;
- at a monument or in a protected town or village view, an environmental permit (omgevingsvergunning) is required.
Municipalities can set additional conditions. Read more in when can an informal-care home be permit-free or view our care units.
Submitting an application: documents and steps
You usually apply for a permit for a living unit via the Environment Portal, where you can check which permission is needed and submit the application digitally. For a good application you often need various documents:
- a site plan;
- a floor plan;
- facade elevations;
- technical specifications of the living unit;
- structural data;
- photos of the location;
- an explanation of the use;
- for temporary placement: a schedule or removal date.
The municipality then assesses whether the plan fits within the zoning plan, the building rules, aesthetic requirements and other conditions. A complete and clear application increases the chance of quick processing and prevents the municipality from having to request additional information. Permit advice is free with us; if you want to hand over the application, we handle it for € 795.00 incl. VAT (€ 657 excl. VAT). We supply drawings and specifications of your unit.
Costs, deadlines and objection in case of refusal
The costs of a permit usually consist of fees (leges), and these differ per municipality and per type of application. Sometimes the costs are calculated as a fixed amount, sometimes as a percentage of the construction cost.
The processing time depends on the procedure. In the regular procedure the municipality decides within 8 weeks, with one possible extension of 6 weeks; simple applications can often be assessed within a few weeks. For more complex plans the extended procedure sometimes applies, and that takes considerably longer.
If the application is refused, the municipality states why the plan does not comply. You can then adjust the design, supply extra information or lodge an objection within the statutory period, usually six weeks after the decision. If in doubt, it is wise to request a preliminary request in principle (principeverzoek) or consultation in advance, so that you know whether the municipality is broadly willing to cooperate before you incur costs for a full application.
What if you place a unit without a permit?
If you place a living unit without the required permit, the municipality can take enforcement action. That can be a penalty order or an obligation to remove the unit. An unpermitted unit can also raise questions when you sell your home. Therefore arrange the permit before ordering, or make the placement dependent on the outcome. Our delivery time averages 8 weeks; so start the permit application in good time.
Is your unit allowed to stand there?
With the free online permit check you can quickly see what is needed at your location. Permit advice is free; having us handle the application costs € 795.00 incl. VAT (€ 657 excl. VAT).
Conclusion
Placing a living unit in the Netherlands can be a practical and flexible solution, but it requires careful preparation. The most important step is checking whether the use fits within the zoning plan and whether a permit is needed. Because rules differ per municipality, it pays to contact the municipality early and submit your application complete. This way you avoid delay, extra costs and possible enforcement afterwards. A living unit costs € 31,950 incl. VAT (€ 26,405 excl. VAT). Curious to know more? Watch our videos.





