Table of contents
- What counts as a living unit under Belgian rules
- When is a permit for your living unit mandatory
- Rules per region in brief
- Care living in Flanders: a notification instead of a permit
- Which documents your municipality usually asks for
- How the application for your living unit permit works
- Costs, time frames and tips to avoid problems
- Connecting and installing in Belgium
- Conclusion
What counts as a living unit under Belgian rules
In the Belgian context, a living unit is usually an independent or semi-independent space intended to live in, temporarily or permanently. Think of a care home in the garden, a mobile living unit, a prefab studio, a tiny house, a container home or an extension used as a separate dwelling.
What matters is not only what the structure looks like, but above all what it is used for: as soon as there are facilities such as a sleeping area, sanitary facilities, cooking facilities or a separate entrance, the authorities may regard it as a residential use. The precise assessment depends on the rules in Flanders, Wallonia or Brussels, and on local planning regulations such as the spatial implementation plan, the regional plan (gewestplan), subdivision regulations or municipal building regulations.
When is a permit for your living unit mandatory
A permit is usually mandatory when you install a new living unit, convert an existing outbuilding into living space, create an extra dwelling on your plot or change the designated use of a building. Temporary living units can also require a permit, especially if they stay for a longer time or are connected to utilities.
In Flanders there are notification requirements or exemptions under certain conditions, for example for some care homes or small structures, but that exemption does not mean that anything goes. Brussels and Wallonia again have their own procedures and conditions.
Factors such as surface area, height, distance to plot boundaries, connection to the sewer, fire safety, neighbours' privacy and parking pressure can determine whether you need an environmental permit. Always contact your municipality's urban planning or spatial planning department before ordering or installing a living unit.
Rules per region in brief
| Region | What you need | Where to apply |
|---|---|---|
| Flanders | Environmental permit for urban planning operations; for care living in a temporary, relocatable unit a notification under conditions | Omgevingsloket Vlaanderen (Flemish environment portal) |
| Wallonia | Urban planning permit (permis d'urbanisme) under the Walloon Code of Spatial Development | Municipal urban planning department |
| Brussels | Urban planning permit under the Brussels spatial planning rules | Municipality (or the region for larger projects) |
You can read more about the specific Flemish and Walloon rules for units in do you need a permit for a living unit in Belgium.
Care living in Flanders: a notification instead of a permit
Do you want to let a parent, child or other family member who needs care live in a unit in your garden in Flanders? Since 16 August 2021 this has been possible with a notification instead of an environmental permit, if the unit is temporary and relocatable and meets these conditions:
- the unit stands entirely within 30 metres of the main home, on the same or a directly adjacent plot;
- distance to the plot boundary of at least 1 metre in the back garden and 3 metres in the side garden;
- maximum 3.5 metres high and maximum 50 m² gross floor area;
- no extra paving other than the strictly necessary access, no deforestation or major change in terrain, and not in a flood zone or spatially vulnerable area (with a few exceptions);
- utilities and wastewater connect to those of the main home;
- the main home is (mainly) permitted.
The installation is valid for a maximum of three years, with one extension of three years through a new notification. If the care lasts longer, an environmental permit is needed after that. The unit must be removed within three months after the care situation ends. The notification is linked to the plot, not to the person. A unit larger than 40 m² must comply with the rainwater regulation, and energy performance requirements (EPB) may also apply.
Our care units are 3.2 metres wide and 8.2 up to and including 13.2 metres long, so between roughly 26 and 42 m². That keeps them under the 50 m² limit. Do check the height and the position on your plot.

Which documents your municipality usually asks for
For a living unit permit application, the municipality generally asks for a clear file with which it can assess whether the project fits within the spatial rules. This usually involves:
- an application form;
- a location plan and a site plan to scale;
- building plans or technical drawings;
- photos of the existing situation;
- a description of the intended use.
You often also have to state how the living unit will be connected to water, electricity, sewer and heating. For care living, additional information may be needed about the care relationship or the temporary nature of the occupancy. Depending on the location, documents may also be requested on rainwater collection, accessibility, stability, fire safety, energy performance or the impact on the surroundings.
For more complex files it is wise to involve an architect, surveyor or urban planning adviser, especially when the living unit is intended to be permanent or when there may be discussion about the designated use of the plot. We supply technical drawings and specifications of your unit.
How the application for your living unit permit works
- Preliminary research: the application usually starts with preliminary research at the municipality, in which you check which regulations apply and whether your project is feasible in principle.
- Submitting the file: you then put together the file and submit it through the competent digital portal, such as the Omgevingsloket in Flanders, or via the procedure that applies in your region or municipality.
- Completeness: the municipality checks whether the file is complete and may ask for additional information.
- Assessment on the merits: sometimes with advice from other bodies or with a public inquiry when the project affects the surroundings or deviates from certain rules. In some cases neighbours can submit comments or objections.
- Decision: approval, approval with conditions or refusal.
Only when the permit is final and any appeal periods have expired is it advisable to actually install the living unit or start the works.
Costs, time frames and tips to avoid problems
The costs of a living unit permit differ per municipality and per type of application. Allow for administrative costs, possible costs for plans, an architect, technical studies and connections to utilities. The living unit itself also brings additional costs for foundation, sewerage, transport and installation; these depend on the location. You tick them in the quote request and receive an indication by email. The unit itself is already well insulated (walls and floor Rc 4.55, roof Rc 5.56). A living unit costs € 31,950 incl. VAT (€ 26,405 excl. VAT).
The processing time depends on the procedure and the completeness of your file; simple applications can go relatively quickly, while files with a public inquiry or advisory opinions take longer.
Tips to avoid problems:
- discuss your plans with the municipality in advance;
- check the urban planning regulations;
- inform your neighbours in good time;
- submit a complete and realistic file;
- beware of temporary solutions: a living unit that stays "just for a while" can still be regarded as requiring a permit.
So do not buy a unit without first being sure that installing it on your plot is legally possible. Also read may you place a living unit in your garden in Belgium.
Connecting and installing in Belgium
Voordeelunits also delivers and installs in Belgium. Permit advice is free, also for Belgium, and if you wish we handle the permit application in Belgium for a fee (price on request). The unit has all connections correctly prepared inside. Connecting to electricity, water and sewer on site is done by a local specialist. For care living in Flanders, the utilities and wastewater drainage must connect to those of the main home; discuss this in advance with your installer. You can read how the installation itself works in installing a living unit: from preparation to handover.
Is your unit allowed to stand there?
With the free online permit check you can quickly see what is needed at your location. Permit advice is free; having us handle the application costs € 995.00 incl. VAT (€ 822 excl. VAT).
Conclusion
A permit for a living unit in Belgium depends on many factors: the region, the municipality, the location of your plot, the dimensions of the unit and above all the intended use. Those who inform themselves well in advance and submit a solid file reduce the risk of delay, refusal or problems afterwards. Do not see the permit as a formality, but as an important step towards realising your living unit safely, legally and sustainably. For care living in Flanders a notification is often enough, provided you meet all the conditions. If you are in doubt about the rules, contact your municipality or get guidance from a specialist in urban planning or environmental permits. Curious for more? Watch our videos.