Why choose an office unit for a renovation
During a renovation, noise, dust, limited access and changing walking routes can make working in the existing building difficult. With an office unit you create a separate, quiet workspace on or near the location, so that business processes can simply continue. This is especially handy for organisations that do not want to interrupt customer contact, administration, planning or project coordination.
Moreover, temporary housing in a unit prevents employees from having to keep falling back on home workplaces or external locations, which benefits collaboration and availability.
Extra workspace quickly without construction delays
A big advantage of office units is that they can be installed and furnished quickly. Compared with temporary internal conversions or renting external office space, a unit is often available sooner and easier to organise. The units can be connected to electricity, heating, internet and sanitary facilities, depending on what is needed. This creates a functional workplace within a short time, without the renovation schedule having to be adjusted or delayed.
The delivery time of an office unit is on average 8 weeks. So order the unit as soon as the renovation schedule is fixed, so that it is ready on the day the first department has to leave the building. All connections inside the unit are ready and correct. Connecting to electricity, water and sewer on site is done by a local specialist. You can read how installation goes in how is an office unit installed?

Comfort and safety in temporary units
Modern office units are much more than simple emergency spaces. They can be fitted with good insulation, climate control, lighting, ventilation and ergonomic workplaces. There are also various options for safety, such as sturdy doors, smoke detectors, emergency lighting and clear escape routes.
Because the unit stands apart from the renovation zone, employees are also better protected from construction dust, noise and other risks that can arise on an active building site. Our office units have walls and floor at Rc 4.55 and a roof at Rc 5.56, so even with a renovation that runs through the winter it stays comfortable inside.
Practical layout for teams and visitors
An office unit can be laid out flexibly based on the daily work. Think of open workplaces for a project team, separate meeting rooms, a reception area for visitors or a small canteen for breaks. Temporary counters, consultation rooms or administration spaces are also possible.
By looking carefully in advance at walking routes, privacy, storage space and the facilities needed, the unit becomes not just an emergency solution but a full temporary working environment. An office unit from Voordeelunits is delivered empty as an open space; toilet and kitchen are optional. That way you choose yourself what is needed during the renovation.

How much space do you need during the renovation?
First count how many people work in the unit at the same time and which functions need to keep running. A few examples:
- Reception or consultation room: a compact unit such as the 5×3 Office Unit Apeldoorn.
- Small department: 9 or 10 metres, for example the 10×3 Office Unit Eindhoven (€ 24,950 incl. VAT (€ 20,620 excl. VAT)).
- Project team with meeting room and pantry: 12 or 13 metres, or several units side by side.
Our office units are available from 5 to 13 metres, from € 15,950 incl. VAT (€ 13,182 excl. VAT). You can see all sizes on price per size.
Permit and coordination with the contractor
A temporary office unit may need an environmental permit (omgevingsvergunning), depending on the zoning plan (omgevingsplan), the location and how long it stays. Under the national building rules, a temporary structure may stand on the same location for at most 15 years. Our permit advice is free; with the permit check you can quickly see what is possible at your address.
Also coordinate with the contractor where the unit will stand. Keep clear: the route for construction traffic, the crane's set-up position, the storage of building materials and the escape routes. That way the unit does not get in the way of the renovation.
Flexibly dismantle or relocate after the renovation
When the renovation is finished, the office unit can easily be removed, dismantled or possibly relocated to another location. That makes this solution particularly flexible and cost-efficient, certainly for organisations that only need extra space temporarily.
Some companies even choose to use the unit for longer, for example as an extra meeting room, project office or reception space during a following construction phase. That way the investment stays practically usable, even after the original renovation is finished. If you want to leave the unit in place permanently, check whether a (new) permit is needed for that.
Conclusion
An office unit as temporary housing during renovations ensures that work can continue without employees suffering daily nuisance from the renovation. Thanks to the quick installation, flexible layout and comfortable facilities, it is a smart solution for organisations that value continuity, safety and efficiency during a renovation period.