Table of contents
- The installation process in brief
- Choosing the right spot for your new living unit
- Check permits and rules in good time
- Preparing the subsurface and connections
- Letting delivery and installation go safely
- Inspection, finishing and handover of the living unit
- What does installing a living unit cost?
- Conclusion
The installation process in brief
- Choose a spot and look at the plot.
- Check the permit and rules.
- Choose and order the unit (delivery time on average 8 weeks).
- Prepare the subsurface and connections.
- Delivery and installation with a crane or crane truck.
- Connection by a local specialist.
- Inspection and handover.
Below you can read what to watch out for at each step. You can also find a detailed schedule in from application to handover in 12 weeks.
Choosing the right spot for your new living unit
The location of the living unit is one of the first and most important choices. Look not only at where the unit looks nice or is practical, but also at accessibility, privacy, daylight and the distance to existing facilities. Think for example of the connection to water, electricity and sewerage, but also of the space needed for transport and installation with a crane or truck.
It is also wise to take neighbours, property boundaries and any future extensions or relocations into account. A well-chosen spot ensures that the living unit can be used comfortably, safely and functionally. You can read more tips in what do you need to prepare on the plot?
Check permits and rules in good time
Before you have a living unit installed, it is important to check which rules apply in your municipality. Sometimes a living unit is permit-free, for example as a care home in the rear yard area or for short-term temporary use, but conditions always apply. Think of the zoning plan (omgevingsplan, formerly bestemmingsplan), maximum dimensions, fire safety, connection to utilities and the duration of use.
So contact the municipality in good time or check the Omgevingsloket, so that you know which documents are needed and which deadlines apply. By arranging this early, you avoid having to postpone delivery or having to adapt or remove the unit later.
Our permit advice is free. With the online permit check you can quickly see where you stand, and if you want the application handled, that costs € 995.00 incl. VAT (€ 822 excl. VAT). You can find detailed explanations in permits for living units in the Netherlands.
Is your unit allowed to stand there?
With the free online permit check you can quickly see what is needed at your location. Permit advice is free; having us handle the application costs € 995.00 incl. VAT (€ 822 excl. VAT).
Preparing the subsurface and connections
A living unit must be placed stably and level, and a suitable subsurface is essential for that. Depending on the type of unit, this can be a concrete foundation, concrete blocks, concrete slabs, a screw foundation or a compacted and level base layer. Rainwater drainage also deserves attention, so that no water remains under or around the unit.
In addition, connections for electricity, water, internet and possibly sewerage must be well prepared in advance. Preferably have this carried out or checked by professionals, especially when it concerns electrical installations or sanitary facilities. Solid preparation makes installation faster and prevents technical problems after handover.
The Voordeelunits unit has all connections ready inside, with a central sewer outlet and a consumer unit in the technical cupboard. Connecting to electricity, water and sewer on site is done by a local specialist. Which foundation suits your situation you can read in which foundation does a living unit need?

Letting delivery and installation go safely
On the day of delivery the route to the installation location must be clear and easily accessible. Check whether there is enough space for the truck, crane or forklift and remove obstacles such as parked cars, low branches or loose materials. The load-bearing capacity of driveways, paving and verges can also be important, especially with heavy living units.
During installation safety is the starting point: only allow authorised persons in the immediate vicinity and follow the instructions of the supplier or installer. When the preparation has been done well, the living unit can usually be put in place quickly and accurately.
If the unit is to stand behind the house, it is often lifted over the home with a crane. Sometimes a temporary exemption is needed for this to place the crane on the public road; we or the carrier arrange this in consultation with you. How transport works exactly you can read in how is a living unit transported?

Inspection, finishing and handover of the living unit
After installation follow the inspection and finishing. Walk through the living unit together with the supplier or contractor and check whether everything has been carried out as agreed. Pay attention to doors and windows, ventilation, heating, electrics, water pressure, drainage, finish of walls and floors and any damage caused by transport or installation.
Also test the connections before the unit is put into use. It is best to have any defects recorded immediately in a handover report, including agreements on repair. Only when everything is safe, complete and functional is the living unit truly ready for use.
Handover checklist
- Doors and windows close properly and are undamaged.
- Ventilation grilles and extraction work.
- Heating or air conditioning works.
- All circuits and sockets work.
- Water pressure and hot water are in order.
- Drainage of shower, washbasin, kitchen and toilet runs well.
- Walls, floors and facade are free of damage.
- The unit is level and rainwater drains away well.

What does installing a living unit cost?
Besides the price of the unit itself, there are costs for transport, foundation and installation or crane work. These depend strongly on your location: the distance, the accessibility and the subsurface. That is why we do not state fixed amounts here. In the quote request you tick what you need and receive an indication by email.
Living units start from € 31,950 incl. VAT (€ 26,405 excl. VAT). You can find all sizes and prices at price per size.
Conclusion
Installing a living unit takes more than just arranging transport. By thinking carefully in advance about the location, permits, subsurface, connections and safety during installation, the whole process goes a lot more smoothly. A careful handover also ensures that you can use the unit with confidence, whether it is intended as a temporary home, care unit, office space or extra living space. Also watch our videos of installations.







