8 weeks delivery on averageOwn installation team2-year factory warrantyOwn service team
NL
Living units · Installation

Installing a living unit: from preparation to handover

Installing a living unit may seem simple at first glance: order the unit, have it delivered and done. In practice, however, there is more to it. From choosing the right location to arranging permits, preparing the subsurface and checking the handover: every step determines how smoothly the process goes. With good preparation you avoid delays, extra costs and practical problems afterwards.

Maarten from Voordeelunits approx. 5 minutes read
Living unit being unloaded from a low-loader by a crane at the installation location
Frequently asked questions

Frequently asked questions about this topic

Can't find your question? Call, email or WhatsApp us.

How long does it take to install a living unit?

The installation itself usually takes less than a day (for a single unit). If you link several units, installation takes longer. Before that comes the delivery time of on average 8 weeks and the time for any permits and preparation of the subsurface.

Do I need a permit to install a living unit?

That depends on the use, the location and the dimensions. Sometimes installation is permit-free, but always under conditions. Do the free permit check or ask us for free permit advice.

Which foundation is needed for a living unit?

A level, stable subsurface, for example a concrete foundation, concrete blocks, concrete slabs or a screw foundation. What suits depends on the soil and the unit.

How much space is needed for the crane?

That depends on the distance to the spot and the type of crane. Provide a clear, solid set-up area and a clear route without cars, low branches or loose materials.

Can a living unit be lifted over my house?

Yes, with a crane that is often possible. Sometimes an exemption from the municipality is needed to place the crane on the public road; we or the carrier arrange this.

Who connects the living unit to water, electricity and sewer?

The unit has all connections ready inside. Connecting to electricity, water and sewer on site is done by a local specialist.

What should I look out for at handover?

Check doors and windows, ventilation, heating, electrics, water pressure, drainage, finish and any transport damage. Record defects in a handover report.

What does installing a living unit cost?

Transport, foundation and installation depend on your location. In the quote request you tick what you need and receive an indication by email.

Do I have to prepare the subsurface myself?

The foundation must be ready before delivery. You can have this done by a local contractor or indicate in the quote request that you need a foundation.

What happens to rainwater under the unit?

Make sure rainwater can drain away well and does not remain under or around the unit. The flat roof drains water via roof outlets.

Can a living unit be moved later?

Yes, a unit can be transported again and placed in a new spot. Take that into account when choosing the spot.

What is the delivery time of a living unit?

The delivery time is on average 8 weeks after your order.

Quote in 5 steps

Request a no-obligation quote

Tell us what you want to use the unit for. You will receive a tailor-made quote.

  1. 1Purpose
  2. 2Type of unit
  3. 3Size
  4. 4Wishes
  5. 5Details
What do you want to use the unit for?
Make an appointment

Schedule an appointment

The appointment is in our showroom: Hazepad 20, 4825 AV Breda.

Do you already have a location for the unit?
Hazepad 20, 4825 AV Breda Plan your route
SIP panel home

Price indication per m²

A SIP panel home is a complete house, built modularly built from SIP panels. Choose the floor area and see the price of the home instantly.

SIP panel home price € 118,800 excl. VAT € 143,748 incl. VAT From € 2,395.80 per m² incl. VAT (€ 1,980 per m² excl. VAT), 2 or 3 bedrooms. Transport, foundation and installation come on top.