Table of contents
Which factors determine the installation time?
The installation time of an office unit is mainly determined by:
- the size and specification of the unit;
- the number of modules;
- the accessibility of the spot;
- the facilities required.
A single standard office unit can often be installed much faster than a linked unit with several rooms, sanitary facilities, a kitchen unit or extra installations. It also matters whether a crane is needed, whether the truck can get close enough to the installation location and whether there are obstacles such as narrow access roads, trees, fencing or heavy traffic on the site. And the weather counts: in strong wind, no lifting takes place for safety reasons.
Average duration from delivery to installation
In many cases the actual installation of a standard office unit takes only a few hours. From the moment the unit arrives on site, it can often be in place the same day. For simple installations you should think of about half a day, while larger or linked office units can take one to several days.
The total period from order to use can of course be longer, depending on delivery time, planning, permits and any custom options. Below you can see how that period is built up.

The total lead time: from order to use
| Phase | Indication |
|---|---|
| Choice and quote | a few days to weeks, depending on your decision |
| Permit (if needed) | regular procedure: at most 8 weeks, extendable once by 6 weeks |
| Production and delivery | on average 8 weeks |
| Preparing foundation and connection points | during the production period |
| Installation | a few hours to a day; linked units longer |
| Connecting by a local specialist and furnishing | usually a few days |
Permit and production can partly run at the same time. So apply for a permit early, or first take the free permit check. Permit advice is free with us; having the application handled is possible for € 995.00 incl. VAT (€ 822 excl. VAT). You can read whether you can install permit-free in when may you install an office unit without a permit?
Preparing the location saves time
A well-prepared location can speed up installation considerably. Think of:
- a flat, firm base;
- enough space for transport and lifting work;
- a clear marking of the spot where the office unit is to go.
If the foundation, concrete slabs or pad foundations are ready in advance, the installation team has to make fewer adjustments on the day itself. Read more in what foundation does an office unit need? and can an office unit be installed without a foundation?
It is also wise to arrange connection points for electricity, internet, water or drainage in advance, so that the unit is functional sooner after installation. All connections inside the unit are ready and correct. Connecting to electricity, water and sewer on site is done by a local specialist. Schedule that specialist for the day of installation or the days after. See also connecting electricity to an office unit and arranging a water connection for an office unit.
How exactly does installation on the day itself go?
On installation day the office unit is usually delivered by truck and set in the right place with a crane. The installation team then checks whether the unit is level and firmly placed. With several units, the modules are linked together and seams, roof edges and interior finishes are neatly completed.
The connections can then be made, such as electrics, lighting, heating, air conditioning or sanitary facilities. At Voordeelunits those facilities inside the unit are already ready; connecting to the grid, the water supply and the sewer on site is done by a local specialist. With a simple unit this process is fairly short, but with larger configurations it requires more coordination and checking. You can read how installation goes step by step in how is an office unit installed? or see it in our timelapse.

When is your office unit ready for use?
An office unit is often ready for use the same day, especially when it concerns a standard unit without complicated connections. Once the unit stands stable, is safely accessible and the necessary facilities work, you can furnish it with desks, chairs and equipment.
For more extensive units with sanitary facilities, several workspaces or custom finishes, it can take a few days before everything is fully operational. Good planning with the supplier prevents surprises and ensures that you know exactly when you can move into the office unit.
Checklist for quick commissioning
- The permit (if needed) has been granted.
- The foundation is ready and level.
- The route for truck and crane is clear.
- Connection points run up to the spot.
- The local specialist is scheduled.
- Internet has been requested; a new connection can take a few weeks.
- Furniture and equipment have been ordered.
Which office unit do you choose?
Our office units are 5.2 up to and including 13.2 metres long (3.2 metres wide), plus the double-width Office Unit Connect of 13.2 × 6.4 metres. A single unit, such as the 9×3 Office Unit Utrecht, is usually in place within a few hours. Office units start from € 15,950 incl. VAT (€ 13,182 excl. VAT). Transport, foundation and installation depend on your location; you tick those in the quote request and receive an indication by email.
Conclusion
Installing an office unit is usually quick, but the exact duration depends strongly on the situation. A simple unit can be in place within a few hours, while a larger project needs more time for transport, installation and connections. For the whole process, allow for the delivery time of on average 8 weeks, plus the time for any permit. By preparing the location well and making clear agreements with the supplier in advance, you shorten the lead time and your new workplace is ready for use as soon as possible.
Want to see more? Watch our videos.