8 weeks delivery on averageOwn installation team2-year factory warrantyOwn service team
NL
Informal-care home · Installation

How long does installation take?

How long an installation takes depends strongly on what exactly is being installed, how well the location has been prepared and whether adjustments are still needed during the work. Even so, a clear estimate can usually be given. In many cases a standard installation is completed within one working day, while more complex situations may need more time. Below you will read what to take into account.

Maarten from Voordeelunits approx. 4 minutes read
Care unit being put in place in one day with a crane truck
Frequently asked questions

Frequently asked questions about this topic

Can't find your question? Call, email or WhatsApp us.

How long does it take to install a unit?

A standard installation takes a few hours to one working day. At a well-accessible and prepared location the lifting work is often done within two to four hours.

How long does the whole process take from order to occupancy?

Allow for an average delivery time of 8 weeks, plus the time for any permit, the foundation and connecting. The whole process therefore usually takes a few months.

Can an informal-care home be installed in one day?

Yes. A care unit is delivered as a complete unit and usually stands on the foundation within one day. Connecting by a local specialist follows afterwards.

What can delay the installation?

A hard-to-reach location, a foundation that is not level, obstacles in the crane's swing area, missing connection points and strong wind.

Does the installation go ahead in bad weather?

In rain the installation can usually go ahead as normal. In strong wind lifting is not safe and the installation is postponed.

Do I need to be present at the installation?

It is wise to be. Then you can help decide on the exact position on site and hear the explanation of use and maintenance straight away.

Can I use the unit straight after installation?

Once the unit is connected to electricity, water and sewer and everything has been checked, it can be used. So plan the connecting by a local specialist beforehand.

How long does the municipality take to decide on a permit?

With the regular procedure within 8 weeks, with one possible extension of a maximum of 6 weeks. Do the free permit check beforehand.

When must the foundation be ready?

Before installation day. A concrete foundation must also have hardened sufficiently. Coordinate the schedule with your groundworker.

What is the delivery time of a care unit?

On average 8 weeks after your order.

Does installing an office unit take as long?

The lifting work is comparable. You can read more about this in how long installing an office unit takes.

Quote in 5 steps

Request a no-obligation quote

Tell us what you want to use the unit for. You will receive a tailor-made quote.

  1. 1Purpose
  2. 2Type of unit
  3. 3Size
  4. 4Wishes
  5. 5Details
What do you want to use the unit for?
Make an appointment

Schedule an appointment

The appointment is in our showroom: Hazepad 20, 4825 AV Breda.

Do you already have a location for the unit?
Hazepad 20, 4825 AV Breda Plan your route
SIP panel home

Price indication per m²

A SIP panel home is a complete house, built modularly built from SIP panels. Choose the floor area and see the price of the home instantly.

SIP panel home price € 118,800 excl. VAT € 143,748 incl. VAT From € 2,395.80 per m² incl. VAT (€ 1,980 per m² excl. VAT), 2 or 3 bedrooms. Transport, foundation and installation come on top.