Informal-care home · Installation

How is an informal-care home (mantelzorgwoning) installed?

Installing an informal-care home (mantelzorgwoning) is a practical way to live close to each other when care or support is needed, without everyone losing their independence. But there is more to it than simply putting a living unit in the garden. From regulations and design to transport, connections and handover: every step calls for good preparation and coordination.

Maarten from Voordeelunits approx. 6 minutes read
Care home hanging from the crane and being lifted over the house to the back garden
Frequently asked questions

Frequently asked questions about this topic

Can't find your question? Call, email or WhatsApp us.

How long does it take to install a care home?

Installing with the crane is usually finished within one day (for a single unit). Including the permit, production (on average 8 weeks) and preparation, the whole process usually takes several months.

Do I need a permit for a care home?

That depends on the location, the size, the care situation and your municipality's rules. Under conditions it can be permit-free in the rear yard area. Take the free permit check for your situation.

What foundation does a care home need?

A level, stable and load-bearing ground. This can be done with concrete pad foundations, screw foundations, concrete slabs or a concrete foundation. Which solution fits depends on the soil and how long the home will stay.

Can a care home be lifted over my house?

Yes, that is possible with a larger crane if the home cannot be reached from the side. This requires extra planning and a suitable set-up spot for the crane.

Who connects the care home to water, power and sewer?

The unit has all connections correctly prepared inside. Connecting to electricity, water and sewer on site is done by a local specialist that you hire.

How much space does the crane need?

The crane needs a solid, level set-up spot, often on the street or driveway, and free swing room without cables or branches. How large the crane needs to be depends on the distance to the installation spot.

Should I inform the neighbours?

It is sensible to. On the day of installation there will be a crane and a transport vehicle, which may mean a temporary closure of the street. Good communication also often prevents objections to the home itself.

Is a care home delivered in one go?

Our care units are delivered as a complete unit. Larger, double-width homes consist of several modules that are coupled together on site.

Can I use the care home straight after installation?

As soon as the local specialist has connected everything and the installations have been checked, the resident can move in. So plan the connections in advance, so that this can happen quickly after installation.

What does it cost to install a care home?

Transport, foundation and lifting depend on the location. In the quote request you tick what you want us to arrange and you receive an indication by email.

Can I view a care unit first?

Yes, by appointment in our showroom at Hazepad 20 in Breda.

How long does the municipality take to decide on a permit application?

Under the regular procedure the municipality decides within 8 weeks. That period can be extended once by a maximum of 6 weeks.

Quote in 5 steps

Request a no-obligation quote

Tell us what you want to use the unit for. You will receive a tailor-made quote.

  1. 1Purpose
  2. 2Type of unit
  3. 3Size
  4. 4Wishes
  5. 5Details
What do you want to use the unit for?
Make an appointment

Schedule an appointment

The appointment is in our showroom: Hazepad 20, 4825 AV Breda.

Do you already have a location for the unit?
Hazepad 20, 4825 AV Breda Plan your route
SIP panel home

Price indication per m²

A SIP panel home is a complete house, built modularly built from SIP panels. Choose the floor area and see the price of the home instantly.

SIP panel home price € 117,000 excl. VAT € 141,570 incl. VAT From € 2,359.50 per m² incl. VAT (€ 1,950 per m² excl. VAT), 2 or 3 bedrooms. Transport, foundation and installation come on top.