When is a permit required for your office unit?
In Belgium you need an environmental permit (omgevingsvergunning) in many cases for placing an office unit, especially when the unit stays for a long time, is placed on foundations or is connected to water, electricity or sewerage. Even if the unit is visible from the public road, has an impact on its surroundings or is used as a full-fledged workplace, a permit may be required. The exact rules differ between Flanders, Wallonia and Brussels, and municipalities can impose additional urban-planning conditions. An office unit is often regarded as a construction, even if it is relocatable, which means it can fall under the spatial planning rules.
The rules per region in brief
- Flanders: you apply for an environmental permit via the Omgevingsloket Vlaanderen. Which actions are exempt is set out in the Exemptions Decree (Vrijstellingenbesluit). The basis is the Flemish Spatial Planning Codex; read about this in what does the Flemish Spatial Planning Codex say about office units? and placing an office unit in Flanders.
- Wallonia: here the permit is called an urban-planning permit (permis d'urbanisme). The rules are in the Walloon Code of Territorial Development (CoDT) and you submit the application to the municipality. More in placing an office unit in Wallonia.
- Brussels: in the Brussels-Capital Region an urban-planning permit is the rule. Because of the dense development and the urban-planning regulations, permit-free placement is rarely possible here.
Which rules apply to temporary office units?
For temporary office units there are sometimes more relaxed rules, especially when they are used on a building site, during renovation works or during a temporary business activity. Still, 'temporary' does not automatically mean 'permit-free'. A maximum placement period often applies, for example a few months or the duration of a building site, and the unit must actually be removed afterwards. In some cases a notification to the municipality is enough, while in other situations a permit is still needed. It is therefore wise to look not only at the duration, but also at the use, the location and the possible nuisance to neighbours or the surroundings.
Examples from Flanders
- Site cabin: for permitted, notified or exempt works, a site cabin is exempt if it stands on the property itself, on the public domain or within the site zone. It must be gone within 30 days after the end of the works.
- Temporary construction: a temporary construction can be exempt if it stays for a maximum of four periods of 30 days per calendar year, is not in a spatially vulnerable area and does not conflict with plans, regulations or subdivision requirements.
- Municipality: the municipality can limit these exemptions or impose extra conditions.
An office unit that stays all year round therefore, as a rule, does not fall under these exemptions.

Placement on your own land: what is allowed?
Even on your own land you may not simply place an office unit without taking urban-planning rules into account. You must pay attention to, among other things, the zoning of the plot, the distance to plot boundaries, the height of the unit, accessibility and any fire-safety requirements. An office unit on an industrial estate will often be easier to justify than a unit in a residential zone, where professional activities at home may be restricted. In addition, rules may apply on parking spaces, paving, water drainage and visual nuisance. Owning the land therefore does not automatically give permission to put any structure on it.
Application to the municipality: how to approach it
The safest approach is to contact your municipality's urban planning or spatial planning department before placement. They can indicate whether you need an environmental permit, a notification or no formal application at all. Gather as much information as possible in advance: the dimensions of the office unit, the exact location on the plot, the planned period of use, the purpose of the unit and any connections to utilities. A site plan or situation sketch is also often requested. By submitting your file completely and clearly, you avoid delays and increase the chance of smooth handling.
Checklist for your file
- Dimensions and technical details of the unit (length, width, height).
- Site plan with distances to plot boundaries and buildings.
- Photos of the current situation.
- Description of the use and the period of use.
- Details on connections, water drainage and paving.
We supply the technical details and drawings of the unit that you need for your file, and give you free permit advice, also for Belgium. Do you prefer not to make the application yourself? We handle the permit application in Belgium for a fee if desired (price on request).

Fines and risks if you build without a permit
Placing an office unit without a permit can have unpleasant consequences. The municipality can draw up an official report (proces-verbaal), demand regularisation or even order the unit to be removed. Fines can also follow, especially when the construction conflicts with the zoning of the land or causes nuisance. Insurers can also make difficulties if damage occurs to or because of a unit that was not placed in accordance with the rules. Anyone who tries to obtain a permit afterwards also runs the risk that regularisation is refused. Informing yourself in advance is therefore almost always cheaper and simpler than solving problems afterwards.
Our office units
Our office units come in lengths from 5.2 up to and including 13.2 metres and are 3.2 metres wide, from € 15,950 incl. VAT (€ 13,182 excl. VAT). An office unit is an empty unit with one open workspace; a toilet and kitchen are optional. For larger teams there is the Office Unit Connect of 13.2 × 6.4 metres, € 68,950 incl. VAT. Inside, the unit has all connections ready. Connecting to electricity, water and sewer on site is done by a local specialist. We also deliver and install in Belgium. Transport, foundation and installation depend on your location; you tick these in the quote request and receive an indication by email.
Conclusion
Whether you need a permit for an office unit in Belgium depends strongly on the situation. Temporary or permanent, small or large, on a building site or on an industrial estate: every detail can make a difference. Because the rules can differ regionally and locally, it is wise to always ask your municipality for advice first. That way you can be sure your office unit is placed correctly and you avoid fines, delays or mandatory demolition.