When do you need a permit for a living unit?
You usually need a permit for a living unit when it is used as an independent dwelling, stays permanently or is connected to utilities such as water, electricity and sewage. Also if the unit affects the zoning plan (omgevingsplan, formerly bestemmingsplan), for example because living at that location is not permitted, you often have to apply for an environmental permit (omgevingsvergunning).
This certainly applies when the living unit is placed on a piece of land where, according to municipal rules, no extra home or outbuilding with a residential function may be placed. Since the Omgevingswet (Environment and Planning Act, 2024), such a deviation is called an off-plan zoning plan activity (buitenplanse omgevingsplanactiviteit). The municipality can grant a permit for this, also for a fixed, temporary period.
The rules for temporary and permanent living units
Different rules often apply to temporary living units than to permanent ones. A temporary unit, for example during a renovation or for informal care, can sometimes be allowed more easily, but even then a permit or notification may be required. Also read living unit as a temporary home during a renovation.
A permanent living unit is more quickly seen by the municipality as a structure with a residential function, which means stricter requirements apply on building safety, fire safety, insulation, health and spatial integration. The duration of use is therefore an important factor in the assessment.

When may a living unit be placed permit-free?
A living unit may sometimes be placed permit-free when it falls within the rules for ancillary buildings, for example in the back garden of an existing home. The unit must then meet conditions on, among other things, maximum height, floor area, distance to the property boundary and use.
It is important that building permit-free does not automatically mean that anything goes: the zoning plan, neighbour law and technical building regulations continue to apply. As soon as the unit is used as an independent dwelling, placing it permit-free is usually not a given.
Exception: informal care
For informal care more is possible. An informal-care home (mantelzorgwoning) in the rear yard area of an existing home can often be permit-free, if there is informal care and the unit complies with the rules for ancillary buildings. For a monument or in a protected townscape or village view, a permit is required. Read more in do you need a permit for a care home?
New rules on the way
With the Wet versterking regie volkshuisvesting (the Dutch Act strengthening housing direction), it will become possible to build and use an informal-care or family home in the rear yard area permit-free. The exact conditions are set out in a decree that is expected to take effect on 1 January 2027. Until then, your municipality's current rules apply. See also new rules for care homes.
Which conditions does the municipality set for a living unit?
The municipality looks at, among other things:
- the zoning plan (omgevingsplan, formerly bestemmingsplan);
- the location on the plot;
- the appearance of the living unit;
- the privacy of neighbours;
- parking;
- safety.
Requirements may also apply for connections, fire safety, ventilation, daylight and sanitary facilities. For care homes the municipality can ask you to show that there is genuinely an informal-care situation. You can read how that works in how does a municipality check informal-care situations? Because rules differ per municipality, it is wise to contact the Omgevingsloket (the Dutch environment portal) or the municipality itself in advance.
The technical building requirements from the Besluit bouwwerken leefomgeving (Bbl, the Dutch Building Decree) always apply, even if you do not need a permit. Our units are built to the Dutch building standard, with walls and floor with Rc 4.55 and a roof with Rc 5.56.
Is your unit allowed to stand there?
With the free online permit check you can quickly see what is needed at your location. Permit advice is free; having us handle the application costs € 795.00 incl. VAT (€ 657 excl. VAT).
How long does an application take and what does it cost?
You submit an environmental permit application digitally via the Omgevingsloket. For most applications the regular procedure applies: the municipality decides within 8 weeks and may extend that period once by 6 weeks. If the municipality has to deviate from the zoning plan and considers the project far-reaching, the extended procedure may apply, which takes up to 6 months.
The municipality charges fees (leges) for the application. How high they are differs per municipality and often depends on the building costs. Check your municipality's fees regulation or ask.
You get permit advice from us free of charge. If you would like us to handle the application, we do so for € 795.00 incl. VAT (€ 657 excl. VAT). Plan the permit generously: the delivery time of a unit is 8 weeks on average, and you do not want the unit to be ready while the permit is still in process.

How to avoid problems with the permit application
You avoid problems mainly by finding out in advance which rules apply to your situation:
- Check the zoning plan.
- Make clear drawings of the living unit.
- Collect information on dimensions, placement, period of use and connections.
- Consult the municipality in good time; many municipalities offer a preliminary consultation.
- Inform your neighbours, certainly if the unit will stand close to the property boundary.
By submitting a complete application and explaining clearly what the living unit is intended for, you increase the chance of a smooth assessment. You can find an overview of all rules in permits for living units in the Netherlands: complete guide and in may you place a living unit in your back garden?
Registering and what happens without a permit
Anyone who goes to live in a living unit registers at that address in the Basisregistratie Personen (BRP, the Dutch personal records database). Whether the unit gets its own house number is decided by the municipality. This can have consequences for allowances, benefits and municipal taxes, so check in advance.
If you place a living unit without the necessary permit, the municipality can enforce. It can impose a penalty order (last onder dwangsom) or require you to stop the use or remove the unit. Applying for a permit afterwards is possible, but the outcome is not certain.
Conclusion
Whether you need a permit for a living unit therefore depends strongly on the situation. A temporary unit for informal care or a renovation can sometimes be placed more easily than a permanent living unit with an independent residential function. Even so, municipal rules, building regulations and the zoning plan remain decisive. Therefore always check in advance what is allowed in your municipality, so that you do not face fines, delays or the obligation to remove the living unit afterwards.
Start with the free permit check and then view our living units. Want to see more? Watch our videos.