Table of contents
- When do you need a permit for your living unit?
- Difference between temporary and permanent living units
- Which rules apply in Flanders, Wallonia and Brussels?
- Care living in Flanders: when is a notification enough?
- How to apply for a permit correctly with the municipality
- Risks of a living unit without a permit
- Practical points to consider before you order
- Conclusion
When do you need a permit for your living unit?
In most cases you need a permit when a living unit is intended to be lived in and will stay on a plot for a longer period. As soon as the unit is connected to water, electricity, sewage or heating, and is used as independent or additional living space, the government and the municipality often see it as a structure that requires a permit.
Placement in the garden, on a building plot or next to an existing house can also fall under urban planning rules. Even if the living unit is relocatable, that does not automatically mean it may be placed without a permit. The precise assessment is usually carried out by the spatial planning department of your municipality.
Difference between temporary and permanent living units
An important distinction is that between temporary and permanent living units. A temporary living unit is used, for example, during renovation work, as an emergency solution after damage to a home or as a care unit for a limited period. In some cases more flexible rules apply to these, or a temporary permit may be enough.
A permanent living unit, on the other hand, is considered a lasting housing solution and generally has to meet stricter urban planning requirements. Think of rules on siting, distance to property boundaries, living quality, fire safety and energy performance. The fact that a unit is technically relocatable therefore does not always make it 'temporary' in legal terms.

Which rules apply in Flanders, Wallonia and Brussels?
The rules differ per region. In Flanders there are specific possibilities for care living (zorgwonen), where a temporary care unit can be placed more easily under certain conditions, for example in the garden or within the existing volume of a home. Even so, you often have to submit a notification or check whether an environmental permit is needed.
In Wallonia, different urban planning rules and procedures apply, laid down in the Walloon Code for Spatial Development (CoDT), which can differ further per municipality. Brussels also has its own regulations. That is why it is important to look not only at general regional legislation, but also at local regulations, subdivision rules and the sector plan (gewestplan). What is possible in one municipality may not be allowed in another.
You can read more about the Belgian situation in permit for a living unit in Belgium: complete guide and in may you place a living unit in your garden in Belgium?
Care living in Flanders: when is a notification enough?
Do you want to place a temporary, relocatable care unit in the garden for a parent or a relative in need of help? Then in Flanders a notification via the Omgevingsloket (Environment Portal) is sometimes enough instead of an environmental permit. According to the Flemish government, the conditions include the following:
- Residents: a maximum of two people, at least one of whom is 65 or older or in need of help. Dependent children of the person in need of help do not count.
- Ownership: the main home and the care unit (or the land beneath it) have the same owner(s), at least bare ownership.
- Location: within 30 metres of the main home, on the same or a directly adjoining plot. In the back garden at least 1 metre and in the side garden at least 3 metres from the property boundaries.
- Dimensions: a maximum height of 3.5 metres and a maximum of 50 m² gross floor area.
- Connections: utilities and wastewater connect to those of the main home. No extra paving is added, apart from a strictly necessary access.
- Duration: a maximum of three years, which can be extended once with a new notification for another maximum of three years.
- Afterwards: within three months after the care situation ends, the unit and the access must be removed. You also report the end of the care living arrangement.
A care unit may not be placed in a flood zone or spatially vulnerable area. If you do not meet one of the conditions, you will still need an environmental permit. Local rules can be stricter, so always check with your municipality.
For comparison: our single-wide units are 3.2 metres wide and 8.2 to 13.2 metres long. They are around 2.88 metres high. A care unit of, for example, 9 or 10 metres stays well within 50 m². Always have the exact dimensions, including foundation, checked against the rules of your municipality.
How to apply for a permit correctly with the municipality
If you want to place a living unit, first contact the urban planning or spatial planning department of your municipality. They can confirm whether you need a notification, a temporary permit or a full environmental permit.
You usually have to provide information about:
- the location and the siting on the plot;
- the dimensions and plans of the unit;
- the function of the unit and the duration of the placement;
- any connections to utilities.
A permit application may also require site sketches, photos and technical details. It is wise to prepare this well in advance, possibly with the help of an architect or a specialised supplier of living units. This avoids delays and increases the chance that your application is assessed correctly. We are happy to supply the technical details and drawings of the unit you choose.
Delivery and permit application by Voordeelunits
Voordeelunits also delivers and installs in Belgium. You also get permit advice for your Belgian situation. If you do not want to submit the application (notification or environmental permit) yourself, we handle the permit application in Belgium for a fee; the price is available on request. Our online permit check is only intended for addresses in the Netherlands.
Notification and application via the Omgevingsloket
In Flanders you submit both a notification and a permit application digitally via the Omgevingsloket. For a notification you hear within 30 days whether the municipality acknowledges it. For care living, occupancy must start within two years after the notification acknowledgement; otherwise the acknowledgement lapses. Only start placing once you have the acknowledgement or the permit in hand.

Risks of a living unit without a permit
Placing a living unit without the right permit can have significant consequences. The municipality can carry out an inspection and demand that the unit is removed or modified. In some cases you risk a fine or a regularisation procedure, where it is not certain that the situation will be approved afterwards.
When the home is sold, an unpermitted living unit can also cause problems, because buyers, notaries and banks increasingly pay attention to urban planning compliance. In addition, insurance issues can arise if damage or a fire occurs in a unit without a correct permit. It is therefore always safer to ask for clarity in advance and follow the rules correctly.
Practical points to consider before you order
Besides the permit, there are a few practical matters to arrange in advance:
- Accessibility: a unit arrives by lorry and is placed with a crane. So there must be room for transport and lifting.
- Ground: the unit stands on a flat, stable foundation, such as concrete blocks, concrete slabs or a concrete foundation. Also read which foundation does a living unit need?
- Connections: the unit has all connections correctly prepared inside. Connecting to electricity, water and sewer on site is done by a local specialist.
- Insurance: report the unit to your insurer, especially if someone lives in it.
View the dimensions and prices at price per size. Our living units are available from € 31,950 incl. VAT (€ 26,405 excl. VAT).
Conclusion
Whether you need a permit for a living unit in Belgium depends on the specific situation, the use and the local regulations. Temporary solutions are sometimes easier, such as care living with a notification in Flanders, but conditions apply there too. Because the rules can differ per region and municipality, informing yourself with your municipality beforehand is the best first step. That way you can be sure your living unit is legally in order and avoid unpleasant surprises afterwards.
Would you like to see more? Take a look at our videos or contact us.






