Why workspace starts in the planning phase
Creating workspace during redevelopment does not start when the first site fences go up, but already at the drawing board. In the planning phase it must become clear which teams, functions and facilities need to remain operational, which spaces can be moved temporarily and where peaks arise in the construction schedule.
By involving users early, insight is gained into daily work processes, walking routes, meeting rhythms and technical needs such as power, internet and climate control. This way workspace becomes not an emergency solution, but an integral part of the redevelopment.
Temporary offices without hindering construction
Temporary offices can be a practical solution, provided they are placed and fitted out in such a way that they do not disrupt construction logistics. Think of modular office units on the site, temporary workstations in a vacant part of the building or relocating to office space nearby.
It is important that these places are easily accessible, offer sufficient privacy and connect to the organisation's digital infrastructure. At the same time, space must remain for construction traffic, material storage and safe access routes, so that contractors can work efficiently without employees constantly being disturbed.

Smart phasing for continuity on the work floor
Smart phasing makes it possible to keep work processes running while parts of the property are renewed. Instead of emptying the entire building at once, work can be done per floor, wing or zone. Employees then move step by step with the progress of the project.
This calls for tight planning, clear milestones and enough flexibility to respond to unexpected delays. By logically linking temporary work zones to the construction phases, the organisation remains reachable, productive and clearly organised.
Safety and comfort during every relocation phase
During redevelopment, safety and comfort must never become subordinate to speed. Workplaces must meet occupational health and safety (arbo) requirements, emergency routes must remain clear and construction zones must be physically separated from user areas. In addition, noise, dust, vibrations and temperature play a large role in daily working comfort.
Clear communication about the work, relocation dates and temporary disruption helps employees prepare better. Small facilities too, such as good signage, quiet phone spots and sufficient meeting space, make a big difference in how smoothly a temporary working situation is experienced.
Temporary workspace: the options side by side
| Option | Strength | Watch out for |
|---|---|---|
| Workstations in a vacant part of the building | No relocation outside needed | Noise, dust and vibrations from nearby construction |
| Relocating to office space nearby | Completely separate from the construction | Travel time, less contact with the project, often a long contract term |
| Office units on your own site | Close by, quickly installed, relocatable later | Space on the site, crane reach and permit |
An office unit is often the best of both worlds: the organisation stays on site, but works in a quiet, insulated space outside the construction zone. Afterwards the unit can be moved to a next project or remain as an extra office, meeting room or base for property management.
An office unit on the site: what to look out for?
A Voordeelunits office unit is an empty, insulated unit that you fit out as an open workspace; a toilet and kitchen are optional. You can choose from 5.2 to 13.2 metres long (3.2 metres wide) or the double-width 13.2 × 6.4 Office Unit Connect. Units can be combined into a larger temporary office.
- Location and accessibility: choose a spot outside the construction logistics, with a clear route for the lorry and room for the crane. Preferably place the units before the site fences close off the area.
- Foundation: concrete pads or road plates on level ground are often sufficient. See which foundation does an office unit need?
- Connections: the unit has all connections correctly prepared on the inside. Connecting to electricity, water and sewer on site is done by a local specialist. Also plan the network connection.
- Planning: the delivery time is on average 8 weeks. So order well before the start of the first construction phase.
- Permit: for temporary placement the municipality often grants a permit for a limited period. Check this early or do the free permit check. Permit advice is free; having us handle the application costs € 995.00 incl. VAT (€ 822 excl. VAT).
From temporary use to lasting added value
Temporary workspace can deliver more than just a solution for the construction period. Redevelopment offers the chance to test which ways of working really suit the organisation: more hybrid working, shared workstations, concentration rooms or informal meeting zones.
What starts as temporary can yield valuable insights for the final layout. By incorporating users' experiences into the final design choices, a building emerges that is not only technically renewed, but also better matches the way people actually work.

Step-by-step plan: temporary workspace in five steps
- Take stock of which teams and functions need to keep running during construction and how many workstations, meeting rooms and how much storage that requires.
- Set the phasing together with the contractor: which zone closes when and for how long?
- Choose a solution per phase: a vacant part of the building, external space or units on the site. Combinations are possible.
- Arrange the preconditions: permit, location, foundation, electricity, water, sewer and network. Order units in good time, because the delivery time is on average 8 weeks.
- Communicate and evaluate: inform employees about relocation dates and disruption, and ask after each phase what could be better. Use those lessons for the final layout.
Would you like to see what a temporary office can look like? Put a unit together in the 3D configurator.
Conclusion
Creating workspace during property redevelopment calls for thinking ahead, cooperation and attention to daily practice. By planning temporary solutions carefully and linking them to the long-term vision, the organisation keeps functioning during construction and room is created for improvement. This way redevelopment becomes not only a construction project, but also an opportunity to durably strengthen work processes, comfort and property value.