8 weeks delivery on averageOwn installation team2-year factory warrantyOwn service team
NL
Living unit being unloaded from a low-loader by a crane Delivery time 8 weeks
Blog · Living units

Living units: installation

From€ 26,405excl. VAT€ 31,950 incl. VAT

From preparing the plot to having the keys in your hand: in this category you can read how a living unit is transported, which foundation is needed and how installation with a crane works.

  • Installation possible in one day (for a single unit)
  • Level, stable subsurface
  • Delivery time on average 8 weeks
Table of contents
  1. Preparing the plot
  2. Transport and installation with the crane
  3. After installation
  4. Step-by-step plan in brief

Preparing the plot

Good installation starts with the subsurface. The unit stands on a level, stable foundation, such as concrete slabs (stelcon), concrete blocks or a concrete foundation. On soft ground, such as peat or clay, ground improvement is sometimes needed; if in doubt, have a contractor or structural engineer take a look. Also make sure that pipes for water, sewer and electricity are in the right place. Read which foundation does a living unit need and what needs to be prepared on the plot.

Transport and installation with the crane

The unit travels to your location on a truck or low-loader and is placed on the foundation with a crane. Check in advance the access route, the load-bearing capacity of the crane's set-up area and obstacles such as trees and cables. In how is a living unit transported you can read how that works. The whole process is described in installing a living unit: from preparation to handover.

Living unit on a truck during transport
Living unit on a truck during transport

After installation

Inside, the unit has all connections ready. Connecting to electricity, water and sewer on site is done by a local specialist. After that the unit is ready for use. How long the whole process takes you can read in how long does installation take.

Step-by-step plan in brief

  1. Check the permit with the permit check.
  2. Choose your unit and request a quote.
  3. Have the foundation and pipes laid.
  4. Production of the unit, on average 8 weeks.
  5. Transport and installation with the crane.
  6. Connection by a local specialist and commissioning.

3 articles

Free

Is your unit allowed to stand there?

With the free online permit check you can quickly see what is needed at your location. Permit advice is free; having us handle the application costs € 995.00 incl. VAT (€ 822 excl. VAT).

Do the permit check
Frequently asked questions

Vragen over living units: installation

Can't find your question? Call, email or WhatsApp us.

Which foundation does a living unit need?

A level, stable subsurface: concrete slabs (stelcon), concrete blocks or a concrete foundation. Which suits best depends on the ground.

Can a living unit be placed on grass?

Not directly. The unit needs a level, load-bearing foundation, so that it does not subside.

How is a living unit transported?

By truck or low-loader. On site a crane places the unit on the foundation.

What if my garden is difficult to reach?

A crane can often lift the unit over a house or shed. Indicate in the quote request how the location can be reached, and we will look into it.

How long does installation take?

The installation itself usually takes one day (for a single unit). Connection by a local specialist follows afterwards.

Who arranges the foundation?

You can have the foundation laid by a local contractor. Tick foundation in the quote request for an indication by email.

Does Voordeelunits also connect the unit to water, sewer and electricity?

No. The unit has all connections ready inside. Connecting to electricity, water and sewer on site is done by a local specialist (installer or contractor).

Should the neighbours be informed?

That is certainly considerate. For a crane on the public road, an exemption or notification to the municipality is sometimes needed; we or the carrier arrange this.

Can a living unit be moved later?

Yes, with a crane and truck, just like the first installation.

What is the delivery time?

The delivery time is on average 8 weeks after your final order. The units are produced in a factory hall of more than 5,000 m², according to the Dutch building standard and ISO 9001.

What costs come on top of the unit price?

Transport, foundation and installation (crane work) depend on your location. You tick these costs in the quote request; you then receive an indication by email. In addition, allow for connection of the utilities by a local specialist and any municipal fees.

Your unit delivered within 8 weeks on average

Request a no-obligation quote or make an appointment at our showroom in Breda.

Quote in 5 steps

Request a no-obligation quote

Tell us what you want to use the unit for. You will receive a tailor-made quote.

  1. 1Purpose
  2. 2Type of unit
  3. 3Size
  4. 4Wishes
  5. 5Details
What do you want to use the unit for?
Make an appointment

Schedule an appointment

The appointment is in our showroom: Hazepad 20, 4825 AV Breda.

Do you already have a location for the unit?
Hazepad 20, 4825 AV Breda Plan your route
SIP panel home

Price indication per m²

A SIP panel home is a complete house, built modularly built from SIP panels. Choose the floor area and see the price of the home instantly.

SIP panel home price € 118,800 excl. VAT € 143,748 incl. VAT From € 2,395.80 per m² incl. VAT (€ 1,980 per m² excl. VAT), 2 or 3 bedrooms. Transport, foundation and installation come on top.