8 weeks delivery on averageOwn installation team2-year factory warrantyOwn service team
NL
Two living units in a garden Delivery time 8 weeks
Blog · Living units

Living units: permits Netherlands

From€ 26,405excl. VAT€ 31,950 incl. VAT

May you place a living unit in your garden or on your land? In this category you can read how the rules under the Environment Act (Omgevingswet) work, when something is permit-free and how to apply for an environmental permit. Permit advice at Voordeelunits is free.

  • Free permit advice
  • Free online permit check
  • Application can be handled for you
Table of contents
  1. How do the rules work?
  2. A living unit in the back garden
  3. How to check it for your address
  4. Temporary or permanent living

How do the rules work?

The Environment Act (Omgevingswet) has applied since 2024. Whether you may place a living unit depends mainly on the zoning plan (omgevingsplan) of your municipality and the use of the unit. An ancillary building in the rear yard area can be built permit-free under conditions, but living independently in a unit usually does not simply fit within the zoning plan. In that case an environmental permit is needed. Read whether you need a permit for a living unit and the complete guide.

A living unit in the back garden

An informal-care home (mantelzorgwoning) for someone who needs intensive care may in many cases stand permit-free in the rear yard area, as long as informal care is involved. For other forms of living in the garden, such as a starter or family member without a care need, a permit is usually needed. The national government is working on a national arrangement to make informal-care and family homes permit-free under conditions as well; so always check the current rules. Read whether a living unit is allowed in the back garden.

Living unit hanging from the crane above a house, on its way to the back garden
Living unit hanging from the crane above a house, on its way to the back garden

How to check it for your address

Start with the free permit check from Voordeelunits, or look at the rules on the Omgevingsloket (Environment Portal). Permit advice is free with us. If you want to hand over the application, we handle it for € 995.00 incl. VAT (€ 822 excl. VAT).

Temporary or permanent living

Municipalities often distinguish between temporary and permanent use. For living in a unit during the construction or renovation of your house, many municipalities grant a temporary permit, usually for a limited period and with conditions such as placement behind the front facade. For permanent independent living, the municipality assesses whether it fits within the zoning plan; if not, a permit for deviating is needed. Therefore consult your municipality early.

Free

Is your unit allowed to stand there?

With the free online permit check you can quickly see what is needed at your location. Permit advice is free; having us handle the application costs € 995.00 incl. VAT (€ 822 excl. VAT).

Do the permit check

3 articles

Frequently asked questions

Vragen over living units: permits Netherlands

Can't find your question? Call, email or WhatsApp us.

Do I need a permit for a living unit?

For independent living usually yes. The zoning plan of your municipality and the use of the unit are decisive.

May I place a living unit in my back garden?

As an informal-care home for intensive care it is often permit-free in the rear yard area. For other habitation an environmental permit is usually needed.

What is the rear yard area?

The yard behind the home, and the yard next to the home from 1 metre behind the front facade. The exact boundary depends on the position of the house.

Is an informal-care home permit-free?

Under conditions yes: informal care must be involved and the home must stand in the rear yard area. Read permit for an informal-care home.

What happens when the informal care stops?

Then the unit may not simply remain in use as an independent home. Ask the municipality what is allowed.

Can I get a temporary permit?

Yes, for example for living during a renovation. Municipalities often grant those for a limited period.

How long does a permit application take?

For a regular procedure a decision period of 8 weeks usually applies, which the municipality can extend once. An extended procedure takes longer.

What does a permit cost?

The fees differ per municipality. Our advice is free; having the application handled costs € 995.00 incl. VAT (€ 822 excl. VAT).

Can neighbours object?

Yes, interested parties can object to a granted permit. Therefore talk to your neighbours in advance.

Does Voordeelunits help with the permit?

Yes. Permit advice is free. If you want to hand over the application, we handle it for € 995.00 incl. VAT (€ 822 excl. VAT). Start with the free permit check.

Where do I find the rules for my plot?

On the Omgevingsloket (Rules on the map) or with your municipality. Or do the free permit check.

Your unit delivered within 8 weeks on average

Request a no-obligation quote or make an appointment at our showroom in Breda.

Quote in 5 steps

Request a no-obligation quote

Tell us what you want to use the unit for. You will receive a tailor-made quote.

  1. 1Purpose
  2. 2Type of unit
  3. 3Size
  4. 4Wishes
  5. 5Details
What do you want to use the unit for?
Make an appointment

Schedule an appointment

The appointment is in our showroom: Hazepad 20, 4825 AV Breda.

Do you already have a location for the unit?
Hazepad 20, 4825 AV Breda Plan your route
SIP panel home

Price indication per m²

A SIP panel home is a complete house, built modularly built from SIP panels. Choose the floor area and see the price of the home instantly.

SIP panel home price € 118,800 excl. VAT € 143,748 incl. VAT From € 2,395.80 per m² incl. VAT (€ 1,980 per m² excl. VAT), 2 or 3 bedrooms. Transport, foundation and installation come on top.