8 weeks delivery on averageOwn installation team2-year factory warrantyOwn service team
NL
Care unit being placed on the plot with a crane truck Delivery time 8 weeks
Blog · Informal-care home

Installing an informal-care home

From€ 26,405excl. VAT€ 31,950 incl. VAT

A prefab informal-care home (mantelzorgwoning) arrives in one piece at your location and is lifted into place with a crane. That goes quickly, but requires good preparation. In this category you can read how the installation goes and what to arrange in advance.

  • Delivery time averages 8 weeks
  • Installation in one day possible (for a single unit)
  • All connections prepared inside
  • 517 units installed
Table of contents
  1. What do you prepare on the plot?
  2. How does the installation go?
  3. How long does it take?
  4. Checklist for installation day

What do you prepare on the plot?

  • Permit: make sure it is clear whether a permit is needed. Do the permit check.
  • Accessibility: the lorry and the crane must be able to get close. Watch out for narrow roads, trees and overhead lines.
  • Ground and foundation: the unit stands on a level, load-bearing foundation.
  • Connections: arrange for a local specialist to lay the pipes and cables for electricity, water and sewer.

Read what you prepare on the plot.

How does the installation go?

The unit arrives by lorry. A crane lifts it off the truck and puts it on the foundation, sometimes over the house. The unit is then adjusted and levelled. The installation itself usually takes a day (for a single unit). The unit has all connections correctly prepared on the inside; connecting to electricity, water and sewer on site is done by a local specialist. See how an informal-care home is installed.

Care home being lifted over a house with a crane
Care home being lifted over a house with a crane

How long does it take?

The delivery time averages 8 weeks. On top of that comes the time for the permit and preparation, then the connecting and fitting out. Read how long installation takes. Transport, foundation and installation depend on your location; you tick them in the quote request.

Checklist for installation day

  • The foundation is ready and level.
  • The access road is clear and the crane can be set up.
  • Neighbours are informed.
  • Any exemption for the public road has been arranged by us or the haulier.
  • The specialist for the connections has been scheduled.
  • You are reachable on the day itself.

Watch this timelapse to see how an installation goes.

After the installation, the specialist connects the unit and the fit-out can begin. Often the resident can move in within a few days after installation, depending on the schedule for the connections.

3 articles

Frequently asked questions

Vragen over installing an informal-care home

Can't find your question? Call, email or WhatsApp us.

How is an informal-care home installed?

The unit arrives by lorry and is put on the foundation with a crane. It is then levelled.

How long does the installation take?

The installation itself usually takes a day (for a single unit). The delivery time of the unit averages 8 weeks.

What foundation is needed?

A level, load-bearing ground. Which foundation suits best depends on the soil and the location.

Can the unit be lifted over my house?

Yes, with a crane this is often possible, if the crane can stand close enough.

What if my garden is hard to reach?

Then we look at which crane and set-up position are needed. Indicate the situation in your quote request.

Does Voordeelunits connect the unit?

No. The unit has all connections correctly prepared on the inside. Connecting to electricity, water and sewer is done by a local specialist.

What does the installation cost?

That depends on your location. You tick transport, foundation and installation in the quote request and receive an indication by email.

Do I need permission to put a crane on the road?

Sometimes. If an exemption or notification is needed for use of the public road, we or the haulier arrange it in consultation with you.

Do I need to be at home during the installation?

That is wise, so you can answer questions and point out the spot.

Can the unit be relocated later?

Yes, a prefab unit can be moved to another spot with a crane and lorry.

Your unit delivered within 8 weeks on average

Request a no-obligation quote or make an appointment at our showroom in Breda.

Quote in 5 steps

Request a no-obligation quote

Tell us what you want to use the unit for. You will receive a tailor-made quote.

  1. 1Purpose
  2. 2Type of unit
  3. 3Size
  4. 4Wishes
  5. 5Details
What do you want to use the unit for?
Make an appointment

Schedule an appointment

The appointment is in our showroom: Hazepad 20, 4825 AV Breda.

Do you already have a location for the unit?
Hazepad 20, 4825 AV Breda Plan your route
SIP panel home

Price indication per m²

A SIP panel home is a complete house, built modularly built from SIP panels. Choose the floor area and see the price of the home instantly.

SIP panel home price € 118,800 excl. VAT € 143,748 incl. VAT From € 2,395.80 per m² incl. VAT (€ 1,980 per m² excl. VAT), 2 or 3 bedrooms. Transport, foundation and installation come on top.