Why a separate water connection is needed
An office unit often needs its own facilities, especially when it stands separate from an existing building or is placed on a site where no direct connection exists yet. With a separate water connection you make sure employees can use sanitary facilities, drinking water and, if applicable, a pantry or cleaning room.
In addition, an independent connection avoids dependence on surrounding buildings or temporary solutions such as water tanks. Especially for long-term use, a fixed connection is usually more reliable, more hygienic and more practical.
Branch off or have your own connection?
If the unit stands next to your home or business premises, an installer can often branch a pipe off the existing internal installation. This is usually simpler and cheaper than a new connection from the water company. A separate connection with its own water meter makes sense if the unit is far from other buildings, if you want to be billed separately for consumption or if there is no water on the site at all.
What is already in the office unit?
An office unit from Voordeelunits is an open workspace as standard. A toilet, washbasin or kitchenette you choose as an option. If you choose sanitary facilities or a pantry, the unit has all connections correctly prepared inside. Connecting to electricity, water and sewer on site is done by a local specialist.
This means that at the location of the unit you arrange a supply pipe for drinking water and a drain to the sewer. Discuss with your installer where the connection points of the unit are, so that pipes and drain are in the right place in advance. In the 3D configurator you can see which options you can choose.

Preparation: location, piping and consumption
Before you apply for a water connection, it is important to be clear about where the office unit will stand and which facilities need water. Determine, for example, whether there will only be a washbasin and toilet, or also a kitchenette, shower or extra taps.
The distance to the nearest main pipe also plays a large part, because it affects the digging work required and the costs. Preferably have an installer look at the internal piping, frost protection, water pressure and the position of the water meter in advance, so that the connection can be carried out properly from a technical point of view.
Preparation checklist
- Floor plan showing the position of the unit and the route of the pipe.
- Number and type of taps: toilet, washbasin, kitchen, possibly shower.
- Position of the drain and the route to the sewer or another drainage facility.
- Frost-free laying of the pipe in the ground and insulation where the pipe enters the unit.
- Accessibility of the water meter and the main stopcock.
Applying to the network operator or supplier
You usually apply for a water connection to the water company that is active in the region where the office unit is placed. This can often be done online via the supplier's website. With the application you provide details such as the address or location, the type of connection, the expected water consumption and, if applicable, a site plan.
If it concerns a temporary office unit, for example on a building site, you can sometimes opt for a temporary construction connection. For a permanent unit, a regular connection with a water meter is generally laid.
Pay attention to the connection conditions
Every water company has its own connection conditions. These state, among other things, that the company itself decides whether an installation is regarded as temporary and how long such a temporary connection remains available. Work on the connection itself (up to and including the water meter) may only be done by or with the permission of the water company. Therefore ask in advance about the current conditions, the lead time and the costs.
Costs, permits and planning at a glance
The costs of a water connection depend on various factors, such as the distance to the main pipe, the type of connection, the diameter of the pipe and any digging or paving work. In addition, there may be costs for the internal installation, inspection, connection fee and periodic standing charge.
In some cases a permit or notification is needed, for example when digging has to be done in public ground or when the office unit is part of a larger building project. Allow for lead times of several weeks, especially when several parties are involved, such as the municipality, contractor, installer and water supplier.
Drainage and sewerage
Water that goes into the unit also has to come out again. For a connection to the municipal sewer you usually ask permission from the municipality. If there is no sewer nearby, there are alternatives such as a waste water tank or a septic tank; ask the municipality what is permitted at your location.
Plan the connection together with the delivery
The delivery time of an office unit is 8 weeks on average. Apply for the water connection in good time, so that pipes and drain are ready when the unit is placed. Transport, foundation and installation depend on your location; you tick these in the quote request and receive an indication by email. Also read what does an office unit cost including installation?
Inspection and maintenance after the water connection
After the water connection has been laid, it is important to check that everything works properly. Look out for leaks, sufficient water pressure, correct placement of the water meter and good drainage of waste water. The installation must also meet the applicable standards for drinking water safety, so that there is no risk of contamination or backflow.
For office units that are used temporarily or seasonally, extra attention is needed for standing water and frost damage. Regular flushing, insulating pipes and periodic inspection help to prevent problems.
Tips for winter and for little use
- Flush taps that are rarely used regularly, so that no water stands still for long.
- If the unit stands empty for a longer period in winter, close the main stopcock and let the pipes drain, or keep the unit heated frost-free.
- Insulate pipes that run outside or in an unheated crawl space.
- After winter, check that no leak has developed.
Also read how to connect electricity to an office unit and what is involved in heating and cooling an office unit.
Conclusion
Arranging a water connection for an office unit takes more than just submitting an application. By thinking carefully in advance about location, consumption, piping, costs and planning, you avoid surprises during installation and commissioning. With the right preparation and cooperation with the installer, supplier and, if applicable, the municipality, the office unit is quickly provided with a safe and reliable water supply.